July 2011 – Febrero 2012
-Detailed engineering development for modernization in reception and milling). grain and brewing house.
CEDIS CHEDRAUI, Zumpango
July 2015 – In progress
-Installation of new sortation system in CEDIS (Mechanical installation of all components in the sorter and conveyors in mezzanine level and in lower level, electrical installation of all equipment involved, air system installation, installation and connection in 5 control panel).
June – July 1992
-Electrical installation in VU-6 No. 3 boiler and relocation of boilers 1 and 2.
November 1992 – April 1993
-Electrical modification of boilers and turbines 1 – 2 and desmineralizer plant.
February 1997 – October 1997
-Modernization of power units installation 1 and 2.
April 1998 – August 1998
-Lighting modernization of turbines area.
March 1999 – November 1999
-Electrical work for control and protection changes with LCP on boilers 1 and 2.
April 2000 – May 2001
-Manpower supply for cooling tower, substation and service building.
December 2006 – October 2007
-Relocation of electrical installations of brewing house.
February 2007 – October 2007
Electrical installation of three filters and waste extraction system.
October 1992 – January 1993
-Effluent water treatment plant.
December 1994 – February 1995
-Room of electric feeder lines.
-Water purification plant by ozonation.
March 1994 – August 1994
-Mounting, installation and start of: METAL-CLAD board 7.2 KV, bus duct 7.2 KV, bank and charger batteries for 7.2 KV board (nickel-cadmium), DC. distribution board.
September 1995 – November 1995
-Electrical work for modification in Cervecería modelo de Guadalajara plant.
June 1996 – November 1996
-Electrical work for IDESA plant.
November 1996
-Maintenance work for METAL-CLAD boards in Compañía Cervecera de Zacatecas S. A. de C. V.
March 1997
-Aditional electrical work for Compañía cervecera de Zacatecas and Cervecería modelo de Guadalajara.
October 1997
-Supervision service for interconections mounting of IRT-105 oven at CIFUNSA plant in Saltillo, Coahuila.
November 1999 – September 2000
-Mills and brewing house 1 electrical installation.
January 2001 – September 2001
-Modernization of electrical installation for substation and METAL-CLAD board in engine room area.
-Electrical maintenance in engine room area.
-Electrical installation of new cooling tower in engine room area.
October 2001 – October 2002
-Electrical installation of ammonia compressor of 500 HP’s.
-Electrical installation of ammonia compressor for CO2 system.
October 2001 – February 2003
-Electrical installation of CO2 recovery system.
October 2001 – August 2002
-Electrical work for three evaporative condensers.
October 2001 – February 2003
-Reconditioning of engine room building.
June 2002 – January 2005
-Electrical installation in engine room area.
January 2003 – June 2004
-Electrical installation in milling tower and brewing house area.
April 2004 – May 2005
-OCME machines line 10 electrical installation.
September 2004 – July 2006
-Electrical installation in current milling tower and brewing house.
March 2006 – March 2008
-Electrical installation of continuous monitoring system in bottling lines 1 to 10.
December 2006 – February 2008
-PVPP filters electrical installation.
May 2007 – May 2008
-Electrical work for modernization of 12 existent unitanks.
February 2008 – March 2008
-Electrical installation at cool rooms.
February 2012 – July 2012
– Engineering services, equipment disconnections, data extraction in order to disconect the next areas: Machine room (refrigeration system, air system, profibus network), HOTBLOCK (milling, brewhouse).
Compañía Cervecera de Coahuila
October 2007
-10 electric contact cars supply for temporary power.
April 2008 – October 2008
-8 electric contact cars supply for temporary power.
-Detailed engineering development for reception and milling grain and brewing house.
January 2009 – October 2010
-Manpower supply for electrical installation (power, control, instruments, grounding, lighting, etc.) in reception and milling grain and brewing house.
-Electrical installation of waste chutes.
September 2011 – February 2012
-Engineering development for electric installation in the distribution center
March 2012 – December 2012
– Electrical installation in the Agency (Substation, main feeders, groundig system, electrical installation in buildings, material supply.
October 2013 – January 2014
-High voltage feeding in the agency (underground piepes for high voltage, transition air-underground, conections, pulling cable, equipment installation according CFE regulations, installation of measurement equipment, derivating bocxes, high voltage registers.).
CEDIS WAL-MART, Culiacan
January 2012 – February 2012
-Two “truck unloaders” installation and two conveyors lines to the existing sorter.
-Material supply (Cable, conectors, pipes, etc.).
CEDIS WAL-MART, Guadalajara
January 2013 – February 2013
-Installation of new sortation system in CEDIS (Mechanical installation of all components in the sorter and conveyors, electrical installation of all equipment involved, air system installation, installation and connection in control panel).
CEDIS CHEDRAUI, Zumpango
Julio 2015 – In progress
-Installation of new sortation system in CEDIS (Mechanical installation of all components in the sorter and conveyors in mezzanine level and in lower level, electrical installation of all equipment involved, air system installation, installation and connection in 5 control panel).
July 2014 – September 2014
-Electrical installation of MCC’s and control panels in cold block, bright beer tanks for new can line. (Panels installation, cabletrays, pipes, conections in motors, panels and instruments, etc.).
January 2015 – In progress
-Electrical installation in Hotblock, Cold block and machine room for phase 2 (panels installation, cable trays, pipes, conections in motors, panels, and instruments, etc.).
April 2015 – In progress
-DEngineering development for electrical installation of Hotblock, coldblock and machine room for phase 2.5.
July 1994 – January 1996
Electrical Installation of the 1st stage engine room for air compressors, ammonia, CO₂, cooling towers.
August 1995 – March 1996
-Electrical assembly in water recover plant for bottling.
May 1996 – August 1997
-Electrical installation of brewing house, reception and milling grain (first stage).
October 1997
-Mounting of main board METAL-CLAD.
December 1997
-Pipeline supply for Z boards of brewing house, reception and milling grain (second stage).
August 1997 – July 1998
-Electrical installation of brewing house, reception and milling grain (second stage).
March 1998 – November 1999
-Electrical installation of engine room (second stage).
March 1999 – November 1999
-Power and control installation for ammonia screw compressor of 1000 H.P.
September 1999 – April 2000
-Electrical installation of engine room (third stage).
June 2000 – January 2001
Electrical installation of silos and grits warehouse (third stage).
March 2001 – April 2002
-Electrical installation for air, ammonia and carbonic gas systems of engine room (fourth stage).
April 2001 – October 2001
-Electrical work on re-pumping system and four water wells.
October 2001 – April 2002
-Electrical installation of four external water wells.
April 2002 – February 2003
-Enlargement of enginge room.
December 1990 – August 1992
-Electrical work for the modernization in the engine room and boilersdepartments.
November 1991 – May 1992
-Electrical work needed in the UNITANKS area.
July – November 1992
-Power and control installation for evaporative condensers.
-Warning system in engine room area.
January 2013 – September 2013
-Reinstallation of new distribution panel. (Supports installation and cable trays and pipes for new cable, installation of new high voltage panels, new cable for every substations in the plant, desinstallation of existing equipment and cabletrays, grounding sustem for the new equipment, short circuit studies, adjustment of protections.).
CEDIS WAL-MART, Culiacan
January 2012 – February 2012
-Two “truck unloaders” installation and two conveyors lines to the existing sorter.
-Material supply (Cable, conectors, pipes, etc.).
CEDIS WAL-MART, Guadalajara
January 2013 – February 2013
-Installation of new sortation system in CEDIS (Mechanical installation of all components in the sorter and conveyors, electrical installation of all equipment involved, air system installation, installation and connection in control panel).
July 2014 – September 2014
-Electrical installation of MCC’s and control panels in cold block, bright beer tanks for new can line. (Panels installation, cabletrays, pipes, conections in motors, panels and instruments, etc.).
January 2015 – In progress
-Electrical installation in Hotblock, Cold block and machine room for phase 2 (panels installation, cable trays, pipes, conections in motors, panels, and instruments, etc.).
April 2015 – In progress
-DEngineering development for electrical installation of Hotblock, coldblock and machine room for phase 2.5.
October 2013 – January 2014
-High voltage feeding in the agency (underground piepes for high voltage, transition air-underground, conections, pulling cable, equipment installation according CFE regulations, installation of measurement equipment, derivating bocxes, high voltage registers.).